-
招聘应聘:
招1人;当前2人应聘
-
月薪水平:
面议
-
职位类别:
电子/机械/工程类
-
工作地点:
太仓新区
-
工作性质:
全职
-
作息制度:
双休
-
食宿情况:
有工作餐
-
工作描述:
1. In Charge of elevator cable development,Includes Design、new material、process and DOE.
负责电梯电缆开发, 包括设计,新材料、 工艺及实验设计。
2. In charge of RFQs, ensuring all quotations are on time.
负责产品报价,确保所有报价按时完成。
3. Be responsible for technical documents, Raw-material specification, BOM, Process Card, product specification Tools drawing etc.; Ensuring technical documents are correct and updated in time.
负责产品技术文件,原材料采购规范、工艺物料清单、工艺文件、产品规范、模具图纸等,确保技术文件准确和及时更新。
4. Technical support KA to develop new customer and market.
为大客户经理提供技术支持开发新客户及市场。
5. Working with process engineer to solve process issues.
与工艺工程师协同解决工艺过程问题。
6. Working with QA to close complains from customer and quality issues.
与质量部协同解决客户投诉和质量问题。
7. Working with Sourcing to develop new supplier to save cost,qualification for raw material ,outsourced product.
与资源团队协同开发新供应商完成成本节约,原材料和外包产品的资质确认。
8. Other temporary works assigned by line manager.
其他临时性工作。
9. In research and development part, gain the quantitative test results, including sample tests, small batch test, production test, lab test and customers’ evaluation, then organize the review activities and give the judgement conclusions.
在研发环节需要获得量化的测试结果, 包括设计阶段测试,实验室测试,生产测试,验收测试和客户使用评价,并且对结果组织评审活动和出具判断结论。
10. In charge of making document records of the activities during testing and judging parts.
需要将测试环节、评审环节进行的活动形成文件记录。
11. Gain the relative design guide, standards, manuals and catalogues.
需要获得相关的设计指南、标准、手册和分类目录。
12. Use corresponding method or tool to demonstrate that the developer has designed and tested performance, reliability and environmental requirements.
需要使用相应的方法或者工具,证明研发人员已经对性能、可靠性、环保要求进行了设计和测试动作。
13. Form a record of the adjustment of the developing and designing progress, including but not limited: testing and evaluating new material as an alternative; attaining and evaluating the past relative design; getting requirements of new products from Marketing Department (Sales) or customers, evaluating them and give acceptance or revision conclusions; getting developing approvals of the materials supplied by the new supplier; getting approvals of acceptance criteria and control plan for finished products; changing and considering the parameters of product function, reliability, maintainability; analyzing the cause and failure of the design; getting change design approvals if it is not led by developer; evaluating and giving advise if the design needs to be changed; so on.
需要将研发设计过程产生的调整形成文件记录,具体包括但不限于如下:测试并且评估了新的材料作为替代方案;获得并且评估了以往相关性较强的设计方案;从市场部门(销售)或者客户直接获得了新产品需求,对其进行评估,给出接受或者修订的结论;新供应商提供的物料需要得到研发的批准;成品出货的验收标准和控制计划需要得到研发的批准;成品功能参数、可靠性参数、可维修性参数的变更和权衡;分析设计产生的故障的原因和失效后果;量产后的设计变更需要得到研发的批准,如果不是研发主导的情况下;设计变更决定之前,需要研发人员现场进行评估和给出建议;等等。